I-beam Stainless Steel
1 Stainless-steel attitude sheet blanketed with wooden plate for protection in transportation.
2. All chrome steel attitude twill be loaded in strong timber applications.
3. Every cartons loaded with well shoring and strengthening.
4. Take discipline loading pics and seal the field.
5. Transportation tempo is short. and preserve client each step knowledgeable.
Products Description
Product name | stainless steel H-beam / I-beam |
Standard | JIS, AiSi, ASTM, GB, DIN, EN |
Size | 100mm-900mm |
Wall thickness | 1.5mm-28mm |
Material grade | 301 303 303Cu 304 304J1 304L 316 316L 309S 310S 316Ti 321 430 420 410 409L 904L |
Application | Hardware products, medical machinery, food machinery, ships, cars, doors and Windows, furniture, large machinery, etc |
Processing Service | Bending, Welding, Decoiling, Punching, Cutting, Moulding |
Keyword | Stainless steel profile,stainless steel bar,huel bars,rod,steel rods |
MOQ | 1 Ton , We can accept sample order. |
Length | 6m-12m ,by customer's requiremnts |
Package | Standard Seaworthy Package |
Surface | 2b, BA, No.4, 8k, hairline, embossed, etched, vibration, pvd color coated, titanium, sand blasted, anti-fingerprint |
Delivery Time | 7-15 Days |
Payment terms | T/T (30%DEPOSIT) |
Quality test | we can offer MTC (mill test certificate) |
Technique | HOT ROLLED |
Hot Rolled Stainless Steel Angle
Item | EN1.4301 304 stainless steel equal angle bar hot rolled bar |
Szie | Width:10-200mm thickness:1-20mm |
Surface | Pickled / Bright / Polished / Satin |
Standard | ASTM A276 / A484 |
Material | 201, 303, 304, 304L, 316, 316L, 321, 904L,2205,2207etc. |
Length | 1-6m or According to Request |
Tolerance | Diameter 0.01-1 mm |
Specification | a. Hot rolled angle bar: (16-200)x(16-200)x(3-18)x(3000-9000)mm or according to your requests b. Acid angle bar: (16-200)x(16-200)x(3-18)x(3000-9000)mm or according to your requests. c. Cold drawn angle bar: (16-200)x(16-200)x(3-18)x(30009000)mm or according to your requests Other specifications can be customized |
Delivery | 10-20 days after get the deposit |